• Delta™ Bridge
    pre-fabricated modular bridging system
  • Delta™ Bridge
    pre-fabricated modular bridging system
  • Atlas™ Bridge
    unique pre-engineered, modular deck system
  • Atlas™ Bridge
    lightweight steel bridging system
  • Pedestrian Bridge
    fully interchangeable steel components
  • Pedestrian Bridge
    for both permanent and temporary pedestrian applications
  • Universal™ Bridge
    designed to cope with the heavy-duty vehicles
  • Universal™ Bridge
    heavy load capability and robust design

universal cover1Case Study LNG Upstream Infrastructure Project, Papua New Guinea

The LNG Upstream Infrastructure Project in Papua New Guinea is a major undertaking in which an extensive pipe work system is being installed capable of carrying 6.6 million tonnes per annum of liquid natural gas from its source in the Southern Highlands to the capital Port Moresby.

An undertaking of this scale requires major supporting infrastructure work. This includes the installation of several bridges along the supply route, replacing many local structures that were in a critical need of repair. Amongst the bridges and infrastructure works needed to support the project was a requirement for a bridge spanning 120m across the Kikori River, the upgrading of the existing Highlands Highway and the installation of other bridges to provide access to the site of the Hides Gas Conditioning Plant.

captcha

Thank you for choosing to download this brochure.
If you don't find the information you needed in the brochure, please do not hesitate to contact us directly

Powered by ChronoForms - ChronoEngine.com

Latest Videos

More Videos

CASE STUDIES - Bridging

Bridging the World...

Engineered Solutions for Connecting People and Places Mabey Brid...

ECM Technologies the exclusive South African partner of:

Get Social

This email address is being protected from spambots. You need JavaScript enabled to view it.

Disclaimer